NewsWhore
12-15-2008, 06:20 PM
. Each dam has a generating capacity of 30 megawatts, the minimum required for a dam to be connected to the national energy grid. Alusa said it already had long-term contracts to sell the energy from...
More... (http://story.brazilsun.com/index.php/ct/9/cid/24437442923341f1/id/20388192/)
More... (http://story.brazilsun.com/index.php/ct/9/cid/24437442923341f1/id/20388192/)