PDA

View Full Version : Drains and sewers ready



NewsWhore
08-28-2006, 06:50 PM
The first stage in the new drainage and sewer system that the construction of the Santo Domingo Metro System made necessary, is now completed. Diario Libre says that the tunnels are finished and now the construction teams have to lay the pipes that will carry the sewage and runoff waters. The job will cost RD$370 million. Rain water will flow in to the Caribbean Sea and the sewage will be treated at an installation at Tres Brazos. According to the newspaper, the new installations will allow even the runoff from hurricane rains to be safely carried out to the rivers and sea.

More... (http://www.dr1.com/index.html#5)