NewsWhore
03-31-2011, 06:40 PM
Odebrecht Energy, the energy division of the Brazilian company currently involved in major infrastructural works like road building in the DR, is studying the feasibility of building a 500-megawatt natural gas based plant. It would be the largest in the country and would cost over US$1 billion. The project would include a re-gasification terminal in the north of the country. The plant would represent 17% of the estimated deficit for 2016. The deficit is estimated at 2,887 according to a press release. Reportedly, the natural gas terminal would be equipped to sell gas to other generators and other projects. At present, the DR has the AES natural gas re-gasification terminal located in Andres, Boca Chica.
More... (http://www.dr1.com/index.html#10)
More... (http://www.dr1.com/index.html#10)